Contec Ingegneria
Contec AQS
Contec Industry
Pronext
Econ Energy
Gruppo Contec
Open Building
Exenet
PMPI

Integrated
know-how

Integrated know-how for architecture, engineering, occupational safety, energy and industrial plant engineering, real estate development, IT and software development

The design of swimming pools Lido di Verona to Contec Ingegneria

The group of companies led by Contec Ingegneria has been awarded the redevelopment of the swimming centre in via Galliano (“Lido”) in Verona, which has been in a deteriorated and abandoned condition for some time.

It will be a redevelopment with a strong Veronese spirit that will restore the swimming centre “Lido” of Verona: the Municipal Administration has assigned to Contec Ingegneria the task of designing and directing the works planned for the restoration of the historic sports and aggregation site of the city.

From the technical point of view, the assignment includes the definitive and executive design, the Works Management, the coordination of safety during the design (CSP) and execution (CSE) carried out by the winning group as follows:

Contec Ingegneria srl (group leader) – coordination of specialist disciplines, Project&Construction management

J+S Architecture & Engineering – architectural design and structures

Idea srl – plant engineering, mechanical and electrical design

Contec AQS srl – Environment Quality Safety: coordination of safety during the design (CSP) and execution (CSE) phases.

Dr. Geol. Simone Dal forno – geological disciplines

 

The start of the requalification has been given: the work team is already active in the development of the final design to incorporate and translate with technical consistency the needs of the Municipal Administration expressed in the previous preliminary project, the starting point for those who participated in the tender. The most important points that will characterize the design will be the absence of architectural barriers, the reception of families and the opening of the structure throughout the year through a combination of outdoor and indoor water activities and wellness disciplines.

“Lido di Verona is one of the most cherished places in the memory of many generations of Veronese people: the period documents that we have researched as inspiration and study material for participation in the competition are full of emotions and history, of our history” begins Stefano Savoia, partner of Contec Ingegneria and Project Manager of the assignment.  “In addition to personal memories and local collective history, this intervention is characterized by a dual responsibility: the fair use of public funds and the reactivation of a context around important values such as sport and healthy fun“.

In the consulting landscape, Contec Ingegneria is the leader of the Contec Group, a group of organizations specializing in technical consulting for construction and management consulting that places it as a single interlocutor for the different needs of the private and public sector.

 

“We are very pleased that our training has been rewarded for the expertise in the tertiary sector and the solidity presented. Moreover, the active synergies within the Contec Group allow us to oversee different disciplines also from a non-engineering point of view. It is through our Pronext unit, which specialises in the management of swimming facilities, that we enjoy an overall view of the complex relationship between Public Administrations and facility managers that has helped us to approach this competition in a winning way” concludes Savoia.

Press review

Press conference (from minute 15.21):  https://www.telearena.it/videos/1984_tg_sera/193724/?fbclid=IwAR1_rTrun0KngyXAG6bH-nxyKwI1Fridq67yQKUuYoKNKeH-AGYohClaidE

https://daily.veronanetwork.it/news/piscine-lido-aggiudicata-la-progettazione/

https://www.larena.it/territori/citt%C3%A0/il-nuovo-lido-aperto-anche-d-inverno-1.8168586

http://www.veronasera.it/attualita/piscine-lido-primo-parco-acquatico-pubblico-progetto-16-luglio-2020.html?fbclid=IwAR2CgKXXyEa4Q7KFHlGeRza_NrhpVG6Y8-PdCUwhtMynssXwYmQ7dSejCis

https://www.giornaleadige.it/lido-una-soluzione-contro-labbandono-domani-parla-rando-ma-ecco-come-e-ora-ridotto/?fbclid=IwAR0oT7HOiK7BZSEwoV3rSusnTor2uI3MrD29j4EX31ET-aXJfXX2I0Df-XQ

Photo credit _ Marcus Ng via Unsplash

 

Tags: , , , , , ,

LOCATION

LOCATION

LOCATION

EMPLOIEES

fatturato_statico_EN
widget logic

TURNOVER

fatturato_statico_EN

THE GROUP